logologo
logologo
  • Competencies
    • Building Structures
    • Infrastructure
    • Specialty Structures
    • Existing Structures
    • Sustainability
    • Digital
  • Projects
  • News
  • About us
hello@co-struct.ch
co–struct AG
Weberstrasse 12
CH—8004 Zürich
+41 44 506 66 30
co–struct SA
Rue du Petit-Chêne 38
CH—1003 Lausanne
+41 21 888 45 60
  • ·EN
  • ·DE
  • ·FR
  • ·IT
  • ·EN
  • ·DE
  • ·FR
  • ·IT
Bridge deck and stay connection
Footbridge construction stages
Force flow in the cable-stayed system
Longitudinal elevation of the footbridge
Bridge deck and stay connection
Footbridge construction stages
Force flow in the cable-stayed system
Longitudinal elevation of the footbridge

1 + 1 = 1

Location

Illarsaz / Aigle, Switzerland

Status

Competition, Competition entry, not awarded

Year

2025

Competency

Infrastructure, Existing Structures

Material

Steel Structures

Field

Infrastructure

Collaboration

co-struct

Client

Cantons of Valais and Vaud

Architect

co–struct AG

Deck width

4.5 m

Number of spans

2

Year built

2005

Triangular steel pylons frame views of the Rhône and the Alps. The Illarsaz competition proposal brings existing and new structures together through a cable-stayed system with a shared pylon on the island.

The competition proposal ‘1 + 1 = 1’ brings an existing footbridge and a new one into a continuous structural strategy. Rather than treating the existing cable-stayed crossing as a separate object, it becomes part of a phased transition towards a new crossing of the Rhône. A shared central pylon on the island connects the two bridge sections.

The cable-stayed system is designed to remain stable during asymmetric construction stages, allowing the crossing to evolve without elaborate temporary supports. The triangular steel pylons also shape the experience of the bridge: their orientation frames the river, the island and the Alps. Exposing the structure makes the path of forces legible while opening views towards the surrounding landscape.

co-struct developed both architecture and structural engineering for the 2025 open competition. The entry was not awarded a prize and is documented as a competition proposal.

hello@co-struct.ch
co–struct AG
Weberstrasse 12
CH—8004 Zürich
+41 44 506 66 30
co–struct SA
Rue du Petit-Chêne 38
CH—1003 Lausanne
+41 21 888 45 60
  • Longitudinal elevation of the footbridge
  • Bridge deck and stay connection
  • Footbridge construction stages
  • Force flow in the cable-stayed system